99精品视频在线观看免费-国产成人久久精品一区二区三区-国产亚av手机在线观看-久久精品亚洲中文字幕无码网站-欧美肥婆姓交大片-日韩毛片无码永久免费看

Wuxi Gotele Metal Products Co., Ltd : CN EN
Home >>News >>News of Construction and Building

Golden Gate Bridge: an Exceptional piece of Steel Engineering



San Francisco’s Golden Gate Bridge is one of the most iconic bridges in the world. It is a so-called suspension bridge: the deck is supported by vertical cables attached to upper larger cables, which -in turn- extend between supporting towers and are anchored at the ends.


The bridge’s construction begun in 1933 and gave chances of employment during the US’s Great Depression. The design was assigned to engineer Joseph Strauss. The constructions time took 4 years costing $35 million and featuring some extreme scenarios.


For example, 3.25 million cubic feet (92,030 cubic metres) of soil excavations were required for establishing the bridge’s anchorages and they are 12-floors tall! The divers had to submerge as deep as 90 feet (27.4 m) in the water to explode rocks and then remove the debris! Despite such difficulties, the bridge finally opened in 1937.


On-site construction of the suspension cables began in 1935. All the bridge’s cables are made of galvanized carbon steel wires and they were laid by a ‘spinning’ technique.


The two main cables alone account for 61,500 tons of weight load on the two 746-ft-tall (227 m) towers! The wires pass on top of the towers and are secured at each end in massive anchorages. The main cables measure 36.22 inches in diameter and they extend for 7,650 ft (2,332 m) each!


Such massive cables were manufactured by grouping together 61 bundles of wire. In turn, each of these is made up of 452 smaller wires, for a total of 27,572 cables! As for the vertical suspended cables, they tie the bridge’s deck to the main cables. There are 250 pairs of them; they are spaced 50 feet apart from each other and measure from 2 to 16 inches in diameter.  All of the vertical ropes were replaced between 1972 and 1976.


It is interesting how the Golden Gate Bridge ‘dances’ up and down depending on the temperature. Hot days with high temperature cause the metal to expand; steel cables elongate and the bridge’s deck lowers. This is especially visible in its central part. Moreover, painting the ‘Red Bridge’ is a non-stop task and of primary importance. In fact, the paint applied to the steel prevents both corrosion and rust that the air with high salt content in may cause.


At Wuxi Gotele Metal Corporation we are passionate about bridges engineering and infrastructure technologies. With the help of our experts we proudly supply products such as Steel Truss Bridge, Diagonal Span Arch Bridge and Compact Panel Bridge. For further information and a full list of products, please click here.

HomeTelProductsContact
CN EN
主站蜘蛛池模板: 午夜视频在线观看| 国产精品蜜桃在线观看| 韩国三级在线观看久| 无码区国产区在线播放| 无码国产精品一区二区免费式直播 | 国产成人无码精品久久久免费| 亚洲午夜未满十八勿入网站| 久久国产成人免费网站| 国内精品久久久人妻中文字幕| 99久久亚洲综合精品成人网| 精品无码久久久久久国产| 人人妻人人澡人人爽曰本| 一区二区在线 | 欧洲| 日本在线视频www色| 久久综合婷婷丁香五月中文字幕| 国产一码二码三码区别| 草草影院精品一区二区三区| 国产色婷婷亚洲99精品| 亚洲一区二区三区在线观看网站| 亚洲中文字幕无码av在线| 久久精品人人槡人妻人人玩| 国产又色又刺激高潮视频| 人人妻人人澡人人爽人人dvd| 少妇人妻在线无码天堂视频网| 极品美女扒开粉嫩小泬 | 国产亚洲精品久久久闺蜜| 免费无码高h视频在线观看| 久久亚洲私人国产精品| 久久精品久久精品中文字幕| 国产小受呻吟gv视频在线观看| 国产av无码专区国产乱码| 精品免费国产一区二区三区四区介绍| 少妇无码av无码专区线y| 嫩草欧美曰韩国产大片| 国产精品午夜福利免费| 国产成人久久综合777777麻豆 | 加勒比无码人妻东京热| 午夜宅男在线永久免费观看网| 亚洲aⅴ天堂宅男| 午夜免费啪视频| 国产精品鲁一鲁|